Skip to content
Florida Green Concrete Solutions

Services

Block walls,
slabs, and flatwork.

Bid as complete, coordinated scopes — labor, equipment, placement, finish, and cleanup.

CMU walls laid inside a steel-frame commercial building, vertical reinforcing standing in the cells

Scope

What we bid

01

Structural masonry & block

Our primary trade and the majority of the work we do. CMU wall construction laid to the drawings, coursed to the elevations, and left ready for inspection.

  • CMU block walls, load-bearing and partition
  • Filled cells, tie columns, and pilasters
  • Bond beams and tie beams
  • Precast lintels and window openings
  • Screen wall, retaining, and site walls
  • Block repair, re-tooth, and opening infill
02

Footing to tie beam & structural concrete

Every wall in the building taken as one scope, sequenced with your inspections and the trades behind us. Commercial and residential.

  • Footings, stem walls, monolithic foundations
  • Slab on grade under the walls
  • Elevated slabs, landings, and stairs
  • Rebar layout, tying, and inspection support
  • Sequenced to your inspection schedule
03

Concrete flatwork

Site concrete placed to grade with a joint layout that controls cracking and a finish that matches the specification.

  • Slabs on grade, garage and warehouse floors
  • Driveways, aprons, and parking areas
  • Sidewalks, walkways, and ADA ramps
  • Curb, gutter, and valley gutter
  • Equipment and A/C pads
  • Broom, hard trowel, and exposed finishes
04

Site preparation

The work that decides whether the concrete lasts: subgrade, forms, vapor barrier, and reinforcement checked before a truck is ordered.

  • Grading and compaction of subgrade
  • Formwork and edge setting
  • Vapor barrier and mesh placement
  • Sleeves, stub-ups, and embed coordination
05

Repair & replacement

Selective demolition and replacement of failed concrete for property managers, HOAs, and homeowners.

  • Saw cut, remove, and replace slab sections
  • Sidewalk trip-hazard correction
  • Driveway and apron replacement
  • Curb and gutter repair

General contractors

Bid invitations welcome

We are already on the bid list for more than ten general contractors around the state. Add us to yours for block and flatwork scopes anywhere in Florida — send the plan set, the bid date, and the scope you want covered.

  • Takeoff from your drawings, not a square-foot guess
  • Inclusions, exclusions, and unit prices stated in writing
  • COIs and workers' comp certificates naming your entity
  • Prompt revisions when addenda or sequence changes land

Process

From plan set to finished slab

Step 01

Site walk & takeoff

We review plans, measure quantities, and confirm access, grade, and pump requirements.

Step 02

Written estimate

A clear scope with inclusions, exclusions, and a pour window — no verbal surprises.

Step 03

Prep & inspection

Forms, grade, barrier, and steel set and verified before concrete is ordered.

Step 04

Place, finish, cure

Supervised placement, specified finish, joints cut on time, curing protected.

Next step

Ready to price your masonry scope?

Send the plan set and we confirm quantities, then return a written estimate you can build a schedule around — anywhere in Florida.